All schemes

Ministry of Ports, Shipping and Waterways - National Shipbuilding Mission

Shipbuilding Development Scheme - Brownfield Capacity Expansion

Brownfield shipyard expansion capital assistance

Grants & awards Capital assistance See official portal
Official portal

What it is

Help existing shipyards prepare a Brownfield Capacity Expansion DPR, establish financial closure, calculate the 25% capital assistance boundary and track milestone-based grant release.

What you get

  • Brownfield shipyard expansion capital assistance

Who it is for

  • the applicant is an existing Indian shipyard with the required operating history and current guideline eligibility
  • the project expands, modernizes or upgrades shipbuilding or repair capacity and contains eligible items under Schedule I
  • the applicant prepares a prescribed DPR and obtains IA/NSbM approval
  • the applicant demonstrates complete financial closure for the approved project cost before the first grant instalment
  • the project accepts third-party monitoring, completion certification, utilization and milestone reporting
ShipyardCompanyPrivate limited companyPublic limited companyPublic sector shipyardJoint ventureOperatingGrowthScalingManufacturing expansionShipbuildingShip repairMarine engineeringMaritime manufacturingIndia

Not eligible if

  • new greenfield clusters belong to the separate Greenfield component
  • capital assistance is calculated case-by-case on approved eligible project cost and is not a guaranteed maximum for every applicant
  • a later project phase or expansion requires fresh application and appraisal
  • the first instalment requires complete financial closure for the entire expansion
  • unsupported land, ordinary working capital, ineligible assets or costs outside Schedule I cannot be assumed eligible
  • sanction, grant release, monitoring and completion are conditional

How to apply

  1. 1
    Confirm existing-shipyard eligibility

    Verify operating history, Indian registration and the distinction between brownfield expansion and the separate greenfield component.

    Official step
  2. 2
    Prepare the DPR and eligible cost

    List the expansion, modernization and technology-upgrade items under Schedule I and prepare the approved-project-cost calculation.

    Official step
  3. 3
    Close the funding plan

    Secure equity and debt commitments for the full project cost excluding the grant and obtain the required CA-certified funding plan.

    Official step
  4. 4
    Apply and track four tranches

    Use the current IA/NSbM route and track 15%, 30%, 35% and 20% tranches against financial closure, progress, utilization and completion certification.

    Official step

Keep ready

Existing Indian shipyard and approved brownfield DPR